Cesspool Conversion Planning Worksheet
Print this page or save a copy before speaking with an engineer or contractor. Leave unknown items blank rather than guessing.
1. Property
TMK:Site address:Owner and best contact:Current use and dwelling count:Planned changes:
2. Existing wastewater system
Known type: □ Unknown □ Cesspool □ Septic/IWS □ Sewer □ Other
Approximate location and age:Known problems or pumping history:Records already available:
3. Site constraints
□ Steep slope □ Shallow rock □ Limited vehicle access □ Retaining walls □ Well □ Catchment □ Stream/drainage □ Shoreline □ Small lot □ Multiple buildings □ Unknown boundaries
Notes:
4. Project goal
□ Meet a current requirement □ Prepare for sale or purchase □ Remodel/add bedrooms □ Replace failing system □ Plan ahead for 2050 □ Explore sewer connection □ Other
Target outcome:Important deadline:
5. Team and approvals
Engineer:Surveyor or other consultant:Contractor:Expected DOH/county approvals:
6. Budget planning
Funds currently available:Financing or assistance to investigate:Estimate assumptions that still need confirmation:
7. Decisions and questions
Decisions needed from owner:Questions for engineer or agency:Next action, owner, and due date:
Use official information
This resource is general information, not engineering, legal, tax, real-estate, or permitting advice. Requirements vary by property. Confirm decisions with the applicable agency and Hawaii-licensed professionals.