Documents to Gather Before an Engineer Reviews Your Property

By Hawaiʻi Cesspool HelpPublished 5 min read


Start with the property address, tax map key (TMK), number of dwellings and bedrooms, current wastewater system if known, and the reason you are seeking help. Add any surveys, plans, wastewater approvals, pumping records, or agency letters you can find. Missing records are common, so make a clear list of what is unknown.

What information is enough to start?

You can start with Hawaiʻi Cesspool Help even if the file is incomplete. We collect the basic property information and connect homeowners with licensed professionals who can evaluate the property and explain the next steps.

Property and survey records

Wastewater records

Household and project information

Photos and field notes

Useful photos can show the general yard, slopes, access, possible lids, wet areas, retaining walls, wells, streams, utilities, and the route from the house. Take photos from a safe location. Never open, enter, or stand on an uncertain cesspool or tank cover.

Label anything you could not verify instead of guessing. The engineer may need to verify locations through records, tracing, survey work, or field investigation.

What the engineer will still need to do

Documents help the licensed civil engineer understand the property, but they do not establish the final system. The engineer evaluates the site, determines the design basis, prepares the plans, and submits the IWS package. Additional survey, testing, or specialist input may be needed.

Before work begins, confirm the professional's active Hawaiʻi license and written scope. Hawaiʻi Cesspool Help can collect your starting information and connect you with a licensed professional.

Ready to put the property records to use?

Send the address or TMK and list the records you already have. We will help connect you with a professional who can review the property information.

Official sources

Send Property Details


Send Property Details